Foxtheon · Stand S151

Meet Foxtheon in Melbourne

Hybrid BESS
That Pays Off.

Lower fuel use. Higher uptime. Better site economics.

EnergyPack connects battery storage, diesel generation, solar and grid power through FoxMind EMS—helping real sites reduce generator runtime without compromising uptime.

28–29 Oct
2026
MCEC
Melbourne
Stand S151
Meet Foxtheon
Three Foxtheon EnergyPack hybrid BESS units at a construction site
Meet the system in MelbourneStand S151
BESS · GENSET · SOLAR · EMS

Hybrid power, explained clearly

Understand the operating logic—not just battery capacity.

Built around the application

Construction, rental, mining, microgrids and off-grid sites.

A useful next step

Bring a load profile, fuel figure or generator question to S151.

Start with the site

A BESS should solve an operating problem.

The right hybrid system starts with load, operating hours and site constraints. At Stand S151, we will use those details to frame a practical energy strategy.

01

Lower fuel use

Store energy through low-load periods and reduce unnecessary generator runtime.

02

Handle short power peaks

Separate peak demand from average load instead of oversizing a generator for a few intense moments.

03

Keep the site moving

Support critical loads through changing demand, generator transitions and intermittent solar production.

04

See and control the system

Coordinate BESS, genset, solar and grid power through one energy-management layer.

The system behind the battery

EnergyPack brings the assets together. FoxMind makes them work as one.

Solar, grid, generator and battery each have a job. FoxMind EMS coordinates the handover around changing site demand, helping reduce diesel runtime without compromising uptime.

Discuss your site at S151 →
INPUTSSolar · Grid · Genset

Available energy sources

CONTROLFoxMind EMS

Real-time operating logic

OUTPUTStable site power

EnergyPack + critical loads

Bring the numbers that describe your site

Load profile, generator rating, fuel use, power peaks, solar availability and deployment constraints.

Foxtheon hybrid BESS campaign visual for All Energy Australia 2026

On display at All Energy

See how hybrid BESS fits the whole power system.

The conversation goes beyond the cabinet. We will walk through sizing, control priorities, generator integration and the operating choices that shape fuel savings and uptime.

All Energy Australia
28–29 October 2026MCEC, Melbourne · Stand S151

Built around the application

Hybrid power for real operating conditions.

01

Rental fleets

Deployable hybrid power for changing sites, temporary loads and fleet operators.

02

Construction

Support cranes, pumps, hoists and site offices without sizing every asset around a short peak.

03

Mining

Reduce generator hours and fuel logistics where grid access is limited or unreliable.

04

Microgrids

Coordinate solar, battery storage and diesel generation around a practical operating strategy.

05

Off-grid projects

Maintain resilient site power while reducing noise, fuel use and maintenance demands.

Schedule a consultation

Book time with Foxtheon at Stand S151.

The booking form below is the same verified form used across Foxtheon.com, including the website’s existing captcha and email workflow.

Please include your preferred day and time in the Message field: Wednesday 28 October or Thursday 29 October; morning or afternoon.

Get A Quote

Get A Quote